Control panels built and installed.
Need a control panel builder who also installs it? We lay out and wire custom control panels, with terminal blocks, PLC and I/O modules, drives and disconnects, then mount them, bring in the power feed and wire the field devices. Tech Electrical Services covers northwest Georgia. Call 706-618-0095 to talk through your panel.
Serving northwest Georgia to Atlanta
Panel work
Build it. Install it.
Control panel build and installation is one line on our service list. Here is what sits inside that line.
- 01LayoutPlacing the disconnect, drives, PLC and I/O, terminal blocks and wire duct on the backpanel so it wires clean and stays serviceable.
- 03Build and wiringMounting DIN rail and components, then wiring the terminal blocks, PLC modules, drives and disconnects inside the enclosure.
- 05Wire labelingLabeled wires and terminals that match the drawings, so the next person tracing a circuit is not guessing.
- 07Field installationMounting the enclosure, bringing in the power feed and landing the conductors where they belong.
- 09Field wiring and racewayRunning raceway and cable from the enclosure out to the sensors, switches, motors and instruments it controls.
- 11Troubleshoot and repairRunning down wiring faults in a panel, new or existing, and fixing what we find.
Inside the enclosure
What goes into a panel build
A good panel starts on paper. We work from your drawings, or from the equipment requirements and device list, and settle where everything sits: disconnect, drives, PLC and I/O modules, terminal blocks and the routes the wire will take. Spacing matters for heat and for the technician who has to work inside it later. We label wires and terminals to match the drawings.
Then it has to go to work in the field. We mount the enclosure, bring in the power feed, run raceway to the field devices and land the wiring. The photo at the top of this page is a panel installation from our portfolio: drives, terminal wiring and the cabling that ties it to the floor.
Two terms worth knowing before you order a panel from anyone. The National Electrical Code (Article 409) requires industrial control panels with power circuits to be marked with a short-circuit current rating, or SCCR. And UL 508A is the UL standard for industrial control panels. Ask your inspector or insurer whether your panel needs that label. If it does, tell us before anything is ordered, because that decides who has to build it.

When to call
When a panel project needs us
A new machine or process needs a panel
Settle the loads, control components and field devices first, then the layout. Bring your drawings and any written requirements.
The existing panel is out of room
More devices can mean more terminals, more I/O and more enclosure space. We look at what is already inside before anything gets added.
A finished panel needs installing
A built panel still has to be mounted, fed and wired to the floor. The site decides the raceway and wiring work.
Nobody can trace the wiring
Missing labels and drawings make every repair slow. Labeling to the drawings fixes that for the next person too.
What to expect
From drawings to a running panel
Tell us what it controls
Call with what it runs, the components you know about, and whether you need a build, an install or both.
We review the details
We go over drawings and the device list, and look at the mounting location, power supply and field wiring routes.
We build, wire and test
We assemble or install it, label the connections and test the wiring we did.
We go over the panel with you
We go over the components, the labeling and what we tested, so your team knows what it has.
Before you call
What to have ready when you call
The more of this you have, the faster we can scope the job.
- Drawings, schematics or terminal schedules, if they exist
- A list of the loads, drives, PLC and I/O, and other components
- Supply voltage and any available fault current information
- Where it will mount, and what the conditions are there: wash down, dust, heat or outdoors
- The field devices it connects to and the rough wiring routes
- Written requirements from your inspector, insurer or customer, including any label requirement
Questions
Straight answers
Can you build a panel and install it too?
Yes. Control panel build and installation is one service for us. The build covers everything inside the enclosure; the installation connects it to power and to the field devices. Some customers need both, some need one.
Does my control panel need a UL 508A label?
That depends on your inspector, your insurer and sometimes your customer. UL 508A is the UL standard for industrial control panels. Get the requirement in writing, and if a UL 508A label is required, tell us before anything is ordered, because that decides who has to build the panel.
What is SCCR and why does it matter?
SCCR is the short-circuit current rating, and NEC Article 409 requires it to be marked on industrial control panels that contain power circuits. It is about what the assembly can withstand during a fault, not its normal load, so it has to be checked against the fault current available at the installed location.
Can you add devices to a panel that is already in service?
Often, if there is room for the terminals, I/O and wiring. We look at what is installed, its drawings and its labeling first. If it is full, we will tell you what the options are.
Other circuits
Related work
Contact
Got a panel job? Call us.
Free estimates
Get a free estimate.
Estimates and second opinions are free. Tell us what you need and where, and we will call or email you back. If it is urgent, call 706-618-0095.
Request sent
Thanks. We have your request.
We will call or email you back. If it is urgent, call 706-618-0095.